Our team is nearing completion of phase one on our newest industrial project, Control Southern. The existing warehouse was torn down to make way for the new manufacturing plant that will be built on the newly constructed building pad. Along with sitework, the existing retention pond at the back of the property is being restructured to allow adequate drainage from the new building.
default default
While phase one for Control Southern included sitework, demolition, and restructuring of the pond – phase two will encompass the construction of the new building. The building will use over 36,000SQ FT between office space and the manufacturing plant.